Insulation
All in One's multi-chamber profiles provide outstanding insulation, thereby reducing high heating bills and external noise levels and have proved highly effective.
Security
All in One windows and doors are fitted with multi-locking devices ensuring maximum protection for your home and family and are approved to Insurance standards.
Minimum Maintenance
Easy to maintain, All In One profiles can be kept clean with an occasional wipe with soapy water, and just add a few drops of light oil to moving parts once a year to keep them at their best.
Roofing
Our Roofing Services caters for the high demand for a reliable roofing contractor in both the commercial and domestic sectors.
The full spectrum of services for roof maintenance and construction are available and include:
- Construction of new pitched and flat roofs
- Re-roofing of pitched and flat roofs
- Repairs to pitched and flat roofs
- Chimneys
- Lead
- Gutters and downpipes
Our workforce is skilled in the specification and application of all roof related structures and materials and we have access to a wide range of reclaimed materials where a period finish or a match with existing is required.
We keep abreast of all new materials and technology entering the market and can guarantee that we’ll find the most efficient and cost effective roofing solution for every application.
- We are able to provide the necessary skills and resources to meet the high standard of service.
- We undertake works in accordance with building regulations and will provide our clients with the appropriate certification where necessary.
- We operate with the appropriate levels of insurance and within the required health and safety guidelines.
- A guarantee is provided which is in keeping with the work undertaken.
Terms and Conditions for Roofing only
1. Our quotation is inclusive of VAT and is valid for 7 days from the date of issue.
2. Our quotation is based on a non-invasive visual survey and is subject to change if concealed issues are identified.
3. We will keep the client fully informed of such findings, advise of any additional costs, and discuss options with the client prior to any additional works being undertaken.
4. With reference to flat roof installations, all membranes are laid to existing falls unless stated that the fall is to be altered prior to commencement of works.
5. For any repair works we will provide our professional recommendation, but we are unable to provide a guarantee for these works. We will always encourage the client to seek comparative quotes and recommendations.
6. If any consents, licenses, or other permissions are needed from any third parties such as landlords, planning authorities, local authorities, structural engineers or similar, it is the client’s responsibility to obtain the same in advance of the commencement of the works, unless otherwise agreed with the contractor.
7. By accepting our quotation, the client agrees to the payment terms noted on this quote, unless otherwise stated in our e-mail communication.
8. Where scaffolding is required, this will only be dismantled once final payment has been received.
9. Payments not received within 72 hours may be subject to a 10% surcharge.
10. By accepting this quote, the client agrees that the contractor shall retain full title to the goods, materials and products used as outlined in this quote until full payment is made by the client.
11. By accepting our quote, the client agrees for the project to be ready for our attendance as scheduled. Should it not be possible to conduct the works quoted, a percentage of the quote will be charged accordingly.
12. The time allowed for works is subject to change, dependant on various factors, i.e., weather. Works may be completed earlier or later than anticipated but the labour cost quoted will remain the same.
13. Some works are weather/ temperature dependant and so whilst every effort is made to provide as much notice as possible, it may be necessary for works to be rescheduled at short notice. We will always do our very best to ensure the works are rescheduled for the same week if conditions allow.
14. The weather can sometimes be unpredictable and so we cannot guarantee that there will be no water ingress during the works should areas need to be exposed to the elements, though great care will be taken by the team to minimise the risk.
15. Cancellation of works needs to be in writing with a minimum of one weeks’ notice. Cancellations made within 7 days may be subject to a cancellation fee.
16. Though great care is taken by the team, the vibrations from our works can sometimes cause minor internal cracks to plaster which we are unable to be held liable for. These are purely cosmetic and no cause for concern.
17. Where parking restrictions are in place, parking permits are to be supplied. Alternatively, the cost of parking will be added to the invoice on completion of works.
If you have any queries or concerns regarding the above, please get in touch and we will be happy to help.
Get in Touch
If you're interested in any of our many services, don't hesitate to reach out to our team and get a quote today.